中文字幕丰满乱子伦无码专区,亚洲综合在线一区二区三区 ,日本边添边摸边做边爱的网站,国产吃瓜黑料一区二区

<tt id="x1fdd"></tt>
  • <tt id="x1fdd"><big id="x1fdd"></big></tt>
  • <span id="x1fdd"></span>
    <fieldset id="x1fdd"><var id="x1fdd"><center id="x1fdd"></center></var></fieldset>
    <small id="x1fdd"><rp id="x1fdd"><thead id="x1fdd"></thead></rp></small>
  • Welcome to the official website of Tianjin Yixin Pipeline Equipment Co., Ltd!
    Tianjin Yixin Pipe Equipment Co., Ltd.
    • Home
    • Products
    • Projects
    • News
    • AboutUs
    English English
    • 中文 中文
    >> Pipeline all position automatic welding machine
    Pipeline all position automatic welding machine
    >> Supporting equipment
    Supporting equipment
    >> Company News
    Company News
    >> Industry News
    Industry News
    >> Common Question
    Common Question
    >> After-Sale Service
    After-Sale Service
    >> Advantage
    Advantage
    >> About
    About
    >> Contact
    Contact
    >> honers
    honers
    • Home
    • Products
      • >> Pipeline all position automatic welding machine
      • >> Supporting equipment
    • Projects
    • News
      • >> Company News
      • >> Industry News
      • >> Common Question
      • >> After-Sale Service
    • AboutUs
      • >> About
      • >> Contact
      • >> honers
    • English
      • 中文
    01-video
    Tianjin Yixin Pipeline Automatic Welding Equipment
    Tianjin Yixin makes welding more efficient and convenient
    05pic
    Pipeline all position intelligent welding machine
    Made in China serving the world
    02pic
    Low labor intensity high efficiency high qualification rate
    Improve the competitiveness of engineering construction
    03pic
    Quality-based creative breakthrough
    Tianjin Yixin is selected for pipeline welding equipment
    01pic
    Breadcrumb: Home > News > Industry News >

    Installation bearing requirements of signal light pole foundation

    Time:2016-03-27

    Signal pole manufacturer's signal lamp flange plate galvanized 550g/m2, bolt and other anchor parts galvanized 350g/m2.Traffic signal pole manufacturer should carry out in strict accordance with the standard requirements during construction. The mark foundation adopts C20 class reinforced concrete foundation, whose top elevation is consistent with the road surface. The edge of the signal lamp shall be no less than 5500mm away from the ground. The foundation adopts reinforced concrete foundation. The construction of intersection pipelines must comply with the construction code for building engineering and the construction code for municipal engineering.· PCV pipe and pipe diameter shall be used for laying pipelines;

    The net distance between the top surface of the pipe and the road should be no less than 0.4m when the pipe trench is dug.

    Where conditions permit, a layer of 95 bricks or crushed stone concrete shall be laid on the top of the pipe to damage the pipe by rolling over.

    The foundation of the pipeline should be compacted after the excavation of the pipeline ditch to prevent the pipeline from being deformed due to the subsidence of the roadbed crushed by road vehicles after the pipeline is buried.

    The backfill soil on the pipe must be tamped down every 15cm of the cover, and finally the road surface will be restored.

    The orifice of the pipe into the kiln well should be extended 3~5cm from the well wall, and all kinds of burrs should be removed from the orifice.

    Signal pole manufacturer's signal lamp should be inserted into a pot wire before the pipe is laid in the ditch.

    Red light automatic recording system auxiliary lighting pillar and camera pillar foundation construction auxiliary lighting part

    Each lane should be installed with an LED cold light source fill light;The light should be focused in the middle of the first third of the coil of the driveway.

    The turn on or off of auxiliary lighting is automatically controlled by time relay and ac contactor.

    Installation location of camera part:

    Signal light pole manufacturer's signal light camera clearance height is 6.0~6.5m, cantilever length 2.0m~3.0m;

    Two cameras are installed on each lane to shoot the panoramic view of the vehicle and the close-up of the front part of the vehicle. The focus of the close-up camera should be in the middle of the first 1/3 of the first coil of the lane.

    Intersection column foundation must comply with the reinforced concrete construction code;· base positioning must be carried out according to the design size;

    The steel cage of the foundation should be fixed temporarily, when ensuring the plane level of the steel cage's foundation roof, that is, measuring with a horizontal ruler in two vertical directions of the foundation roof, observe the bubble must be centered;

    Concrete pouring and ramming of camera rod foundation must be compacted and free drum of concrete is forbidden.

    Signal pole manufacturer's signal lamp should be sealed with plastic paper or other materials in advance in the construction of embedded pipe mouth, so as to prevent concrete leakage into the embedded pipe when pouring and tamping, resulting in blockage of the embedded pipe;

    After pouring and ramming the foundation, the foundation surface must be higher than the ground surface 5mm~l0mm.

    Concrete must be maintained for a period of time to ensure that it reaches a certain strength of erection.

     

    Previous: Next:Shandong Linshu steam pipeline network
    Back

    Contact:Manager Chen

    Tel:+86-22-23889667

    Mobile:+86 13820221715

       +86 13194693183

    Copyright:COPYRIGHT ? 2016-2025 yixinpipe ALL RIGHTS RESERVED

    Support:Junyuan

    Address:No.28 Mold Park B4, Saida Fourth Branch Road, Xiqing Development Zone, Tianjin

    感谢您访问我们的网站,您可能还对以下资源感兴趣:

    中文字幕丰满乱子伦无码专区,亚洲综合在线一区二区三区 ,日本边添边摸边做边爱的网站,国产吃瓜黑料一区二区
    <tt id="uk8pp"><dl id="uk8pp"><pre id="uk8pp"></pre></dl></tt>
    <sup id="uk8pp"><rp id="uk8pp"></rp></sup><tt id="uk8pp"><big id="uk8pp"><pre id="uk8pp"></pre></big></tt>
  • <menu id="uk8pp"><li id="uk8pp"></li></menu>